Case Study
Medlock Bridge Elementary
The Challenge
Make the school more welcoming, blending new signage with old. Medlock Bridge Elementary needed content flexibility while looking like permanent signage. All while ensuring their social emotional system, the 7 Mindsets, were front and center.
The Solution
A combination of permanently placed signage and snap frames, which allow for content flexibility. Other signage used metal standoffs and cleat systems to push them away from the wall, allowing them to appear as floating while allowing conduit to run behind.